Test running note of Scraper conveyor (II)

This article is the continuation of previous one. PK Machinery will introduce you load testing running of scraper conveyor.

Load test running 

1. Once no-load test running becomes normal , please test run with load.
2. After scraper conveyor runs with load normally, please feed the material uniformly to avoid blockage.

3. The casing must be fully sealed to avoid the material overflowing. A grate net must be added on the inlet to avoid massive material or hard objects enter into the scraper conveyor. 
4. After material inside the scraper conveyor is discharged from the outlet completely, then stop the machine. 
5. During no-load and load test running, please make a record that includes voltage, current, power and scraper chain running speed etc. and check whether they meet the requirement of design or not. 

2015年8月13日星期四

Test Running Note of Scraper Conveyors (I)

PK Machinery offers horizontal scraper conveyors and inclined scraper conveyors, the angle can range from 0 degree to 90 degrees. Scraper conveyors are widely used for transporting cement , coal, metallurgy, mining, construction material, chemical, grain etc. There are two stages of test running : no-load and load test running. Here PK Machinery will introduce it in details:

Non-load test running
1.Check if there is any remaining tool, iron casting pieces and other hard objects inside the scraper conveyor, if any , please clear up. 
2.Give enough lubrication to all the bearings, driving devices and drive chain etc. 
3.Check if all the scraper conveyor parts are intact, whether the tense of scrapers is suitable or not. 
4.After finish checking the above items, then power on and switch off several times to see if the operation is normal, if normal, run the scraper conveyor continuously.
5. In addition, the head, tail , medium parts and other main structures, workers must be sent to observe the running , if any problems, please solve it without delay.